BIM Adoption and Implementation

BIM TOPiCS DiagramBIM Adoption and Implementation

This work investigates the BIM adoption process within a project context.  We have been studying BIM projects for over a dozen years and have found that successful implementation requires a balance between the three dimensions of Technology, Organization and Process (TOP), and an understanding of the Context and Stage of implementation.

We recently utilized this framework to analyze seven different case studies: Building Information Modeling (BIM) ‘Best Practices’ Report: An investigation of ‘best practices’ through case studies at regional, national and international levels (Funded by Western Economic Diversification, Productivity Alberta, and the Alberta BIM Centre of Excellence).

 

a place of mind, The University of British Columbia

Faculty of Applied Science
5000 - 2332 Main Mall,
Vancouver, BC, V6T 1Z4, Canada
Tel: 604 822 6413
Email:
BIM TOPiCS Lab
2031 – 6250 Applied Science Lane,
Vancouver, BC, V6T 1Z4, Canada
Tel: 604.827.5118
Email:

Emergency Procedures | Accessibility | Contact UBC  | © Copyright The University of British Columbia