Coordination and Collaboration

Computer Supported Cooperative Work (CSCW)Our research and industry collaborations on BIM projects has led to an increased understanding of the coordination process and the knowledge required to create a coordinated and constructible design.  Recent projects
have investigated:

  • Artifact interactions: Tory, M., Staub-French, S., Po, B., and Wu, F. (2008). “Artifact-Mediated Coordination in Building Design.”  Journal of Computer Supported Cooperative Work (CSCW), 17(4), p 311-351.
  • Change Management (based on the work of Behzad Langroodi): Langroodi, B.P. and Staub-French, S. (2012). “Change Management with Building Information Models: A Case Study.” Accepted for publication in the Proceedings of the Construction Research Congress, ASCE, West Lafayette, Indiana USA, May 21-23, 10 pages.

change management

a place of mind, The University of British Columbia

Faculty of Applied Science
5000 - 2332 Main Mall,
Vancouver, BC, V6T 1Z4, Canada
Tel: 604 822 6413
Email:
BIM TOPiCS Lab
2031 – 6250 Applied Science Lane,
Vancouver, BC, V6T 1Z4, Canada
Tel: 604.827.5118
Email:

Emergency Procedures | Accessibility | Contact UBC  | © Copyright The University of British Columbia